3/1 threw the project
3/2 footed and left to dry 3/6 out of the kiln 3/7 glazed and on shelf 3/9 out of the glaze kiln pot and lid thrown on 2/5
footed 2/6 footed an put to dry 2/9 on bisque shelf 2/22 ou of the bisque 3/1 glazed 3/8 out of the glaze 1/23 started the coil pot
1/24- added all the layers and left in locker to dry 1/25- put on shelf to bisque 2/5- out of bisque kiln 2/1 thrown on wheel
2/2 footed 2/5 on bisque 2/6 out of bisque glazed and on shelf 2/9 out glaze |